MIRABILLIA NEWS #112
APRIL 2017
OUR CULTURE

At the time we were starting up MIR VALVE back in 2007 I was trying to come up in a few words what MIR VALVE stood for, what defined our spirit and culture so employees could identify. So I came up with a mantra based around Energy.

 

NO ENERGY, NO LIFE

KNOW ENERY, KNOW LIFE

 

I believe the core energy in each of us is what drives us to reach our potential, do great things. All great leaders have tremendous energy to drive their companies, and all great companies have employees with tremendous energy levels integrated as one to achieve success.

 

Our Energy drives our passion, experience, motivation, ideas, spirit collectively to reach our full potential.

Now you know what is required from you when working for MIR VALVE.

 

Stasi Prandalos, CEO

ENTER KUWAIT

Our “never give up“ attitiude on this project tender which lasted well over 6 months finally paid off – for us being awarded this very prestigious package.
Kuwait is currently a very busy market with a number of large scale projects underway.


The order consists of:  22 pcs. MV1 Top-Entry Ball Valves, MOV’s for heavy crude oil service
30”, 34”, 36” CL. 150/300, soft seated, weld overlay in sealing areas
12” CL. 1500 metal-seated+TCC, Lipseals , weld overlay in sealing areas
16”, 34”, 36” CL. 150 and 24” CL.600 buried service (stem extension up to 3.7m), weld overlay in sealing areas
c/w Rotork Electric Actuators


EPC: CCC, UAE
End-User: Kuwait Oil Company (KOC)
Project: Lower Fars Heavy Oil Development Program Phase-1
Onshore oil pipeline

HIGH PRESSURE SUBSEA DBB BALL VALVES

We have delivered 3 pcs of  MV4-SS Subsea DBB Ball Valves in 14 weeks
2” CL. 900 / 1500, FB, RTJ, Metal-seated+TCC
Body: CS + Inconel 625 Weld Overlay, Trim: Superduplex
Norsok, Manual Lever
56m water depth

 

Project: North Malay Basin, Subsea Malaysia
EPC: UGL
End-User: HESS MALAYSIA

3-WAY BALL VALVES FOR ADMA-OPCO

We have delivered our first order into Italy to Bellelli Engineering for the NASR Field Development Project for ADMA-OPCO, UAE.


MV6 3-Way Ball Valves
2” CL.300, FB RF, Body SS, Trim SS/Duplex
Norsok Compliant, Bare Stem


NASR Field Development Project
Offshore UAE
EPC: Bellelli Engineering Italy
End-User: ADMA-OPCO, UAE

TRAINING OF PETRONAS GTS AND SSGP ENGINEERS AT MIR PLANT

On 4-5 April, MIR VALVE conducted 2-days training for 24 engineers from Petronas GTS and SSGP personnel at our HQ and plant in Shah Alam. 


The course is prepared for multiple background participants for manual and actuated ball and gate valves API 6D. The main focus was on the applications and design fundamentals of ball and gate valves as well as the manufacturing processes.


The training covered 1 day classroom and 1 day production floor, total of 2 full days.


The engineers experienced the ball valve assembly from the component level up to the finished unit. They also were learnt about the manufacturing processes from incoming raw materials, QA/QC, assembly, testing procedures.


Participants who complete this training are expected to be able to demonstrate knowledge of how the valve is designed and manufactured and the application towards their requirement processes.


Petronas sent us an email the day after, thanking us for a very well run course.


MIR VALVE organizes regularly valve training programms for our customers.

SEE YOU AT OGA 2017

We have confirmed our presence at OGA, South East Asia’s biggest and best petroleum industry exhibition running since 1987.

It has today more attendees and more exhibiting companies than any other show in the region.

 

We will be in top location, Hall 1, Booth 1711. Visit us.